For Students & Teachers

Writing feedback
you can trust

Vysti is a deterministic writing engine — not AI. Built by veteran teachers, it delivers consistent, transparent analysis of student writing. Same essay, same score, every time.

See how it works

Got a handwritten essay?

Snap a photo and get your score in seconds.

Scan to try Vysti on your phone

Try it on your phone

Snap a photo of any handwritten essay and get your score instantly. Scan the QR code to open Vysti on mobile.

How Vysti works

Three steps. Consistent results. No guesswork.

1

Upload

Drop in an essay or a full class set — .docx files, any length.

2

Analyse

Vysti applies 100+ deterministic rules across four scoring dimensions.

3

Improve

Students revise with targeted feedback. Teachers return scored, annotated essays.

Four dimensions of writing quality

Every essay is scored on the same four metrics — rules, not opinions.

Power
Verb strength and impact
Analysis
Analytical depth and evidence
Cohesion
Flow and logical connection
Precision
Word choice accuracy
For Students

Revise with confidence

Upload your essay and get instant, rule-based feedback on every paragraph. Vysti shows you exactly what to fix and why — then lets you edit and recheck until you're satisfied.

  • Four performance meters based on concrete rules, not opinions
  • Edit in-browser and recheck — same rules, updated score
  • Every issue links to the exact sentence with the rule behind it
  • Download your polished draft when you're done
For Teachers

Mark an entire class in minutes

Upload a class set and get every essay scored against identical standards. Vysti handles the consistency so you can focus on the human touch.

  • Batch-mark an entire class in one upload
  • Class rosters with persistent notes per student
  • Annotate every essay: highlights, strikethroughs, comments
  • Auto-generated Final Comments — five-section semester remarks in your voice, fully editable
  • Deterministic score card — same essay, same result, every time
  • Re-mark any essay; your annotations and grades survive
For Teachers & Parents

Send parents a report that proves the teaching

At semester's end, generate a Progress Report for every student. Charts each meter's trend across the term, surfaces the strengths they developed, and prefaces it all with a personalised teacher's comment. Parents see the proof.

  • Trend chart of every meter (Power, Analysis, Cohesion, Precision) across every assignment
  • Auto-generated Final Comment at the top — in your voice, fully editable
  • Verb repertoire grouped by 6 categories: analytical, demonstrative, evaluative, rhetorical, transformative, declarative
  • Rhetorical techniques from a curated 300+ device dictionary — anaphora, chiasmus, Menippean satire, all of it
  • Higher-order thinking — concepts engaged, thinkers cited, historical references
  • Writing-craft stats across every body paragraph
Vysti Progress Report — page 1: personalised teacher's Final Comment, total-words and total-issues cards, the four average scores (Power/Analysis/Cohesion/Precision), and a multi-line chart of each meter's trend across twelve assignments

Try Vysti free

Upload your first essay at no cost. No credit card required.

Get started